Pipeline · Interconnection Queued
LaSalle Solar + BESS
33-acre community solar site in the Town of LaSalle, Weld County. Site executed February 2026 with BESS add-on rights from day one.
Weld County, CO Xcel Energy WECC Target COD 2027-Q4
- Solar MW-DC
- 4.9
- BESS MW
- 3
- Status as of
- May 7, 2026
Site
33 acres in the Town of LaSalle, Weld County. Long-term lease executed February 2026 with BESS add-on rights from day one.
Interconnection
Distribution-level interconnection on Xcel Energy’s system. Feasibility Study is underway.
Status
- 33-acre site control executed February 2026
- BESS-ready site design (up to 3 MW)
- NTP Q4 2026, COD Q4 2027